2017 – Cwm Prysor’s Time!

Firstly, a belated Happy New Year to everyone.

You may have noted things have been rather quiet around these parts. I have decided to cut down my online presence as I felt I was saturating my work by posting on the FB page, modelling forums and here. It seems best to focus on one place, and those that are interested will find me here, on the blog. I also needed the Christmas period to rid myself of some demons, so it’s fair to say 2017 feels like a real fresh start.

So, to kick things off…. those of you that read the model railway magazines may have seen I had an article in this months Railway Modeller on the goods stock for Cwm Prysor. It was an interesting article to write and I can’t thank Steve Flint and Railway Modeller enough for giving me the opportunity to share my ramblings. What is nice is that this article, and the subsequent two I’ve written, are all gearing up for the big one…’Cwm Prysor’ which will be appearing in the Modeller (probably next year).

15974930_1244055242296160_66879576343202694_o

As for Cwm Prysor, I took a break from the layout over Christmas, but since the New Year progress has been coming on well. The platform is now in place, the landscape is fully formed around it and we even have the shelter in place (courtesy of Geoff Taylor). The station area has had plasticard added so there is a nice flat base for the station building, plus a seamless join into the level crossing.

Recent work though has seen the dilapidated snow defences put into place. I’ve seen a photo from around 1910 where these sleeper defences are all standing in place, neat and proper. By the 1950s though, they were really uncared for and that is how they are represented on the layout. Special thank to Tim Horn for supplying the laser cut sleepers.

_mg_8708

Finally, I’ve begun work on the over bridge at the Blaenau end of the layout. Tim kindly laser cut the MDF pieces for the buttresses to my specifications. The bridge itself I have no photos of it, so I’ve based it on the one further down the line at Capel Celyn. The girders are by plaststruct with 20 thou plasticard on top. The railings are from Geoff Taylor’s etched range of building accessories. These need shortening which will be done tomorrow, before I primer the girder/railings and spray satin black. The buttresses will be coated in Das modelling clay, and then a few weeks later the stone work will be scribed.

img_5021

Everything is coming together nicely, I’ve ordered the scenic bits to do the lake and stream and all the grass work is here for when it’s needed. So there is lots going on at the moment!

2017 is Cwm Prysor’s year!

‘Dad and Lass’ courtesy of Modelu – forever on my layouts….

IMG_8692.jpg

Advertisements

3 thoughts on “2017 – Cwm Prysor’s Time!

  1. Nice to see you back on here Tom.
    Peter Kazer used to use DAS modelling clay for his buildings (going back to his Portmadoc layout), and he used to scribe it while it was still damp. He rolled it flat between 2 pieces of strawboard to get a consistent thickness, stuck it to the base with pva adhesive. He used to use an old toothbrush to give it it’s initial texture, and then went on to scribe it damp, keeping the bits not being worked on under a damp facecloth. More in the Jan 1981 Railway Modeller.
    Kevin.

    • Thanks Kevin, interesting technique. I’ve been guided by Mr Geoff Taylor so far, who has suggested scribing once dry so for the moment I’ll follow that method. I’ll try and pick up a copy of that 1981 Modeller. 🙂

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s