Cwm Prysor – Fully Wired!

Good Morning all!
Very brief update. The layout is now fully operational!

I’m extremely pleased I’ve managed to do it (wiring was something I didn’t think I’d be able to do) and with some advice from Ken Gibbons and Andy Jones, the process wasn’t as difficult as I thought. Below is a quick video I made last night, just to show locos and stock moving over the new area. The point is operated with a DPDT switch, which switches the polarity, and manually switches the point.

 

Just the fiddle yards to go, and we can start thinking about scenic work! 🙂

Advertisements